Network and Data Center Solutions
Modular Data CentersAST-Global

IT Check

Model #: IT check
IT Check by AST
The goal is to test and measure the parameters that may affect the performance of the Data Centre, in order to detect any possible risk
-Provide a comprehensive and detailed understanding of all the critical elements of the customer's Data Centre infrastructure, in order to determine the areas and level of potential risk of failure, identify the priority areas of improvement and set the investment priorities.

Buy Specifications

  • Service Content
    Power Quality
    · Grounding and Earthling: Resistance at main SB and at another random point of the
    data centre and Equipotent evaluation.
    · AC power events at main SB and Data Centre SB:
    · Frequency, Voltage, Transients, Conducted noise, Outages, Sags, Swells
    · Harmonics: measurements at main SB LV and Data Center SB.
    · Electrical system dimensioning analysis: UPS, engine generators, etc. (redundancy)
    · Thermography: switch boards analysis (connection points), buss-bar and specific
    machines.
    Electromagnetic Fields
    · Electrical Fields: Measurements at different points
    of the Data Centre, depending in its size and
    following the Maxwell Equations.
    · Magnetic Fields: Measurements in accordance to
    the Maxwell equations. In this case will be measure
    the Magnetic Field in the 2 Data Centres according to the layout of the Electrical
    Cables, Electrical Switches, UPSs and Transformers situation, but at least every 4x4
    meters in a bi-dimensional lay out of the room.
    · Risk analysis: Evaluation of TEMPEST (Transient Electro Magnetic Pulse Emanation
    Technology).

Buy Features and Benefits

Data Network
· Copper cable quality: transmission parameters collection of 15
cables following the ISO 11801 (with two link and channel test
on every one), specifically: cross-talk, attenuation, Next, Fext,
ACR (Attenuation Cross Talk Ratio), Power Sum Next, Power
Sum Fext.
Operation Security
· Check the existence of a DC’s Procedures-Operations
Manual.
· DC’s Access System Evaluation.
· Check the location of switches, computers, routers, HVAC
equipment, etc.
· Check the protections of switches at power boards.
· Fire protection system evaluation.
Structural Security
· Site location and associated potential risks
· Architectural structure
· Anti-vandalism and intrusion
· Fire resistance and protection:
RF60, 90 or 120ü EN23093 , EN1047
· Gas tight
· Water protection:
IP 62
IP65
· Thermal stability

Don't forget about our Bar Code & RFID Products and our Financial Products! Imprint has everything you need to keep your business running smoothly.

We accept Visa, MasterCard, and American Express cards